Construction of the second stage of the National Museum of the Holodomor-Genocide continues. External work is nearing completion; as of today, 68% of the total volume has been completed. Approximately by the end of this year, they should be completed and internal work will begin. The construction of the pedestrian bridge is nearing completion. Equipment for the engineering support of the structure has been delivered, networks are being installed, and elevators are being installed. Measures are being taken to waterproof the adjacent areas of structures. Modern equipment and high-quality materials are used. Access roads are being laid to strengthen the landslide slope.