Construction continues. The installation of metal structures of the pedestrian bridge is progressing, reinforced concrete elements for the entrance area are being erected. A metal roof structure is installed above the cinema room. All steel structures are manufactured at our STALTECH plant. Work continues on the laying of a communication tunnel and a vertical shaft. At a depth of 12 meters, the tunnel bumped into an aquifer, which hinders further development of the soil. We fight this problem with the help of Jet Grauting technology (jet grouting of soil). When the soil has been strengthened, vertical excavation will continue for another 15 meters.