13
/26
11.01.2021
06.01.2021
31.12.2020
24.12.2020
14.10.2020
03.10.2020
14.09.2020
10.09.2020
07.09.2020
23.08.2020
20.08.2020
19.08.2020
17.08.2020
07.08.2020
07.08.2020
18.07.2020
11.07.2020
14.06.2020
20.05.2020
23.04.2020
19.03.2020
15.03.2020
11.03.2020
25.02.2020
14.02.2020
04.02.2020
Pedestrian bridges in August 2020
The construction of two pedestrian bridges across the light rail line is going to be completed.
Watch an interesting video report by Pavel Avdokushin about our construction on YouTube: