Completed work:
- Fencing of pit with bored piles (ø 1020 mm, ø 820 mm, ø 620 mm) - 4100 m³;
- Sheet piles ø 300 mm - 277 rm;
- Soil injection anchors - 496 rm;
- Jet-columns ø 500 mm, ø 600 mm -1534 rm;
- Monolithic grillages -248 m³;
- Floor slab - 3250 m³;
- Installation of monolithic reinforced concrete frame - 18265 m³;
- Installation of brick walls;
- Installation of metal structures - 381 t;
- Facade works.
- Fencing of pit with bored piles (ø 1020 mm, ø 820 mm, ø 620 mm) - 4100 m³;
- Sheet piles ø 300 mm - 277 rm;
- Soil injection anchors - 496 rm;
- Jet-columns ø 500 mm, ø 600 mm -1534 rm;
- Monolithic grillages -248 m³;
- Floor slab - 3250 m³;
- Installation of monolithic reinforced concrete frame - 18265 m³;
- Installation of brick walls;
- Installation of metal structures - 381 t;
- Facade works.