Completed works:
— Earthworks — 65197 m³;
— Pile installation — 13990 m³;
— Foundation slab — 3028 m³;
— Installation of metal structures — 8472 t;
— Mechanical installation — 8413 t;
— Brickwork — 1154 m³;
— Industrial floor - 1176 m³;
— Monolithic structures of silos and tunnels — 19018 m³;
— Foundations — 11708 m³.