Completed work:
— Complex of earthworks — 10001 m³;
— Construction of pile foundations — 730 m³;
— Erection of metal frame — 197.4 t;
— Installation of grillages — 298 m³;
— Manufacturing and installation of silos and bunkers — 94 t;
— Installation of sandwich structures — 3567 m²;
— Installation of Lindab sandwich roof — 3924 m²;
— Erdem roofing — 495 m²;
— Monolithic floor structures — 120.91 m³;
— Internal brick walls and parting wall — 328 m³;
— Concrete floors with Pambex coating — 775 m²;
— Finishing works — 5487 m².