Completed work:
- Installation of reinforced concrete bored anchor piles ø 620 mm;
- Conducting static tests of soil using piles;
- Installation of reinforced concrete bored piles ø 620 mm for pit fencing;
- Installation of reinforced concrete bored piles ø 620 mm of pile field;
The total volume of reinforced concrete bored piles at the facility is 1319.45 m³.