Completed works:
— Installation of Diaphragm wall — 3849.02 m³;
— Strapping beam on Diaphragm wall — 229.3 m³;
— Spacer structures — 65143 t;
— Installation of injection anchors — 2186.5 rm;
— Installation of anchor soil piles ø 300 mm — 1020 rm;
— Installation of flat Jet panels — 317.2 rm;
— Installation of pile field from bored piles ø 520 mm L - 9 m;
— Earthworks — 44,539.27 m³;
— Installation of monolithic structures — 10576.51 m³;
— Installation of piles for a crane ø 300 mm — 71.94 m³;
— Bricklaying works.