Completed works:
— Earthworks — 39600 m³;
— Grillage on retaining walls — 1670 m³;
— Preparation period;
— Installation of retaining walls PS-1, PS-2, PS-3, PS-4, PS-5, PS-6, PS-7
— Installation of bored piles ø 820 mm, ø 1020 mm;
— Installation of a monolithic wall.