Completed works:
— Installation of Diaphragm wall H = 28.7 m — 4 211 m³;
— Installation of metal structures — 148.7 t;
— A full range of emergency and restoration work;
— Installation of monolithic reinforced concrete structures — 10,400 m³;
— Restoration of courtyard facades — 4721 m²;
— Restoration of brickwork — 798.9 m³;
— Roof installation — 14,734 m².